Hot line string replacement by Hot-stick method  
 
       
  We carry out Hot line insulator string replacement by hot stick method.  
 
1) All the benefits of Hot line string replacement by bare hand technique can be achieved in this method also.
2) This method of string replacement is suitable upto 220 kV level.
3) In this method defective jumper can be replaced by using hot line tools.
4) Outage is avoided by using parallel jumpeing.
5) Minimum working clearance must be maintained while operating hot line tools.
 
     
  Minimum Body Clearances From Live Lines. While Operating Hot Line Tools.
 
     
 
Sr. No . Phase To Phase Voltage Minimum Clearance
1. 11 KV 0. 61 METER (2’0”)
2. 33 KV 0. 71 METER (2’4”)
3. 66 KV 0. 91 METER ( 3’0”)
4. 132 KV 1. 07 METER ( 3’6”)
5. 220 KV 1. 5 METER ( 5’0”)
6. 400 KV 3. 35 METER ( 11’0”)
 
     
     