THEMOGRAPHY |
|
|
| |
|
|
| |
ECONOMICS OF THERMOVISION
SCANNING |
|
| |
|
|
| |
Why preventive maintenance is always
economical than diaster management can be seen from
a simple statistics.
|
|
| |
|
|
| |
Suppose one 400 kV line transmitting
250 MW of load goes under breakdown for about 10 hrs
and there is no possibility of load deviation, what
would be the energy loss, revenue loss and national
wealth loss?
|
|
| |
|
|
| |
250000 KW x 10 hrs. = 2500000 KWH
i.e. loss of 25 Lakhs of units
Considering rate of Rs. 4/- per unit the revenue loss
works out
to RS 100 Lakhs i.e. Rs.1 Crore
|
|
| |
|
|
| |
This is just revenue loss of the electric
supply company but considering industrial production
loss, agricultural production loss and loss due to commercial
and residential activities. The national loss of wealth
would be about 10 times the revenue loss, which works
out of to the tune of RS 10 Crores apart from dissatisfaction
of consumers due to inconvenience, and expenditure in
attending breakdowns at unexpected time.
|
|
| |
|
|
| |
Thus a small expenditure on thermography
can avoid 100 times the revenue loss and makes the system
interruption free.
|
|
| |
|
|
| |
We all know that 'A stitch in time
saves nine' hence I propose all the honourable engineers
and authorities of the electrical generation, transmission
and distribution system to make thermo graphic analysis
of the electrical system and reduce the breakdowns which
gives warning bell, pin pointing the 'HOT SPOTS,' enabling
them for preventive maintenance, attending immediate
attention.
|
|
| |
|
|
| |
Some sample thermal images and reports
generated by M/s. Ramelex Pvt. LTD Pune while executing
thermography of 400 kV lines & substations are displayed
herewith for idea of clarity.
|
|
| |
|
|
| |
CIRCUIT
BREAKER AT 22 kV SNDT s/s |
|
| |
|
|
| |
 |
|
| |
|
|
| |
|
|
| |
Jumpering
cone of 132 kV Beed- Telgaon S/C Line. |
|
| |
|
|
| |
|
| |
|
|
| |
Jumpering
Cone at 132 kV Girawali Parali D/C Line |
|
| |
|
|
| |
|
|
|
| |
|
|
| |
NUT
BOLTS OF JUMPER AT 400 kV LINE |
|
| |
|
|
| |
 |
|
|
| |
|
|